Value engineering is a systematic structured and analytical method to reduce the Value of the project/item by
providing all necessary functions at the lowest cost, ensuring with required
levels of quality, reliability and performance of a product/service/items of a
project. Value engineering is a
combination of technical and economic management technique which leads
to improves the function and reduce the cost.
Major reasons for choosing Value Engineering are to achieve cost saving, make a clear project objective and provide creative thinking for design improvement as Innovations. The crucial cause of concern in Value engineering process are as follows
- Time saving
- Cost reduction.
- Innovations, Benefits & Efficiency
- Quality & Reliability
In
the complete life cycle of the project, the value engineering shall be a formal
activity which can propose by the Contractor or Consultants in the important
variations or to avoid difficulties in executions or innovations ideas that
leads cost savings wherein functionality remain same or upgraded. If the
proposal is accepted by the Client or Owner or Consultant, the overall cost
savings to be shared both owner and contractor. This must be included in the
contract agreement so that contractor may encourage to develop, prepare and
submit value engineering change proposals.
While processing a Value Engineering in construction
projects, the blow mentioned items must be consider
- Availability of materials
- Construction methods
- Transportation
issues
- Site limitations or restrictions
- Planning and organization
- Costs & Profits
- Reduction of environmental impacts
The task involved in the Value engineering process are as follows.
- Identifying the main elements of a product, service or project which can be apply the Value engineering.
- Analyzing
the functions & Importance of those elements
in the actual needs of the project.
- Developing
alternative solutions for delivering those functions.
- Presenting
the proposals to the Client or Owner or Consultant
- Assessing
&Evaluating the alternative solutions with all the Concerns teams.
- Approving
or Accepting the concept proposal and Ensuring that it is innovative
solutions.
- Creating
a matrix which involves Value analysis, Engineering Value and Management Value
- Allocating costs to
the alternative solutions.
- Developing
more details of the alternatives
- Analyzing
the Cost and profits
- Agreeing
with all the parties for the profit shares
- Executing
the works as per the new proposals, Testing the Functionality and Ensuring the
Efficiency.
- Delivery
of the Activities/Products/Projects to the Client or Owner
Application
of Value Engineering in different Phases of the Construction Projects and
Advantages.
- Engineering
& Design Phase
The
Value Engineering in Design & Engineering phase of a Project will offer the
great opportunity for cost saving. During this phase the Contractor or
Consultant can use the latest technologies & trends in the market, either
by use of intelligence base digital designs such as Building Information
Modeling (BIM) technology, Virtual Design and Construction (VDC), Computer
aided Designs (CAD) technology (2D, 3D & Revit etc), Layouts etc. these Digital Engineering Analysis will
provide the support to the Economical study leads to the cost saving in the
preliminary stage of the project. And
based on the type of projects the Cost saving can be shared to all the parties.
Like for Design Bid & Construction projects Majority shares to be taken by
the client (if it is derived prior to the Bid). And for Engineering procurement
& construction projects the profits should be shared mutually.
- Materials
& Procurement Phase
- Erection
or Construction Phase
- Commissioning
and Operational Phase